July 5, 2012
Casework Installed
The cabinetry is installed in the exam rooms and the ceiling grid has been installed. We will have floors and a bulk of the electrical done next week! Thanks greatly to Blue Room Architecture, Walla Walla Electric, Leone & Keeble, and Apollo Heating.
Posted in Uncategorized